f52f02c4-3458-4672-b71a-4454ef51c7adInstallation of Polyiso roof insulation, R15 (A5) [PIMA]Installation (A5) of Polyiso roof insulationMaterials productionPlasticsThis data set contains the results for the module A5. It includes the installation of the insulation product into the building. This information module also contains effects and aspects that are associated with losses at the building stage (e.g. waste treatment and disposal of waste and material losses as well as the transport thereof).113This stage includes the unloading of the Polyiso roof insulation from the truck to the roof using a crane or all-terrain
forklift. This stage also includes removal of all packaging and the placement of the individual roof insulation boards
by a roofing crew on the roof deck prior to the application of the roofing system, including all associated releases to
environmental media (air, soil, ground, and surface water). Once installed beneath a watertight roofing system, the
Polyiso roof insulation requires no maintenance until the roofing system is replaced.Truck - Trailer, basic enclosed / 45,000 lb payload - 8bLCI resultAttributionalnoneAllocation - market valueAllocation - net calorific valueAllocation - exergetic contentAllocation - massEnvironmental Product Declaration - Polyiso roof insulation boards95.0No statementthinkstepthinkstep2019-02-01T00:00:00.000ILCD format 1.1thinkstep2019-02-01T00:00:00.00000.00.001Data set finalised; entirely publishedthinksteptrueFree of charge for all users and usesPolyiso Insulation - InstalledOutput0.2244769761678610.2244769761678610Mixed primary / secondaryUnknown derivationvaluable